Action Plan/Timeline

Date  Action
 1/16/17 SB 0550 legislation signed.
 2/13/17 Zion Elementary District 6 contracted with Aires Consulting for Water Sample Testing. Coordination of testing follows Illinois Department of Health Sampling Guidelines.
 3/27/17-3/31/17 Water samples drawn. .
 4/10/17 Zion Elementary District 6 received test sample results Aires Consulting.
 4/10/17 Immediate action to take all fixtures out of service yielding lead levels above 20 ppb.
 4/11/17 Buildings and Grounds department begin coordination of remediation plan. Drinking water delivered to locations with high impact of drinking fountains, with daily replenishments.
 4/17/17 Letter notification of current lead levels provided to students and staff.
 6/5/17 Fixture remediation: start date has been determined by availability of replacement fixtures and/or repair materials. 

Website by SchoolMessenger Presence. © 2024 SchoolMessenger Corporation. All rights reserved.